Client Outcomes
Real problems, worked through lane by lane.
Every case study below is a demonstration of how we approach a freight, warehousing or delivery problem — the challenge, the plan, and what changed. All companies and figures shown are fictional demo content built for this project.
Baobab Consumer Goods: Rebuilding a Regional Distribution Network in 90 Days
Baobab Consumer Goods
A regional FMCG distributor consolidated four inconsistent depot contracts into a single Northstar network and cut rural stockouts by more than half.
- 97.6%
- On-time delivery
- -62%
- Rural stockout incidents
Sable Pharma Distribution: Holding Cold Chain Integrity Across Five Regions
Sable Pharma Distribution
A pharmaceutical distributor replaced paper temperature logs with digital, exception-alerted cold chain tracking across a five-region delivery footprint.
- 0
- Temperature excursions
- 5
- Regions covered
Harborline Apparel Group: Scaling Last-Mile Capacity for Peak Season Without Missed Windows
Harborline Apparel Group
An e-commerce apparel retailer built a seasonal last-mile surge plan with Northstar to absorb nearly 4x baseline volume without a drop in delivery-window accuracy.
- 3.8x
- Peak volume increase absorbed
- 96.2%
- On-time delivery during peak
Kestrel Mining Co.: Moving Oversized Drilling Equipment Without a Missed Production Window
Kestrel Mining Co.
Fourteen oversized equipment moves to a remote mine site, each planned around road surveys and permit lead times, with zero missed production windows.
- 14
- Equipment moves completed
- 0
- Missed delivery windows
Have a Similar Problem
Tell us the lane, the load and the constraint.
A dispatch coordinator or account manager can talk through what's realistic before you commit to a rate.